The Project part II

January 17, 2008 · Filed Under Cycling · Comment 

The Deda Newton bars and tape have arrived from the UK. The Stem has arrived in from the U.S. I’ve lined up the bike shop to do “The Big Switch” over on the 23/11. I’ll post details on the switch once all the components are in and the 3 frames are packed off to the shop.

The anticipation of looking at the System6 frame leaning up against the Carbon Mountain bike while I’m waiting on the final part to arrive is slowly breaking me. There is nothing worse than looking at this great new frame but not been able to ride it! The Bottom Bracket Adaptor has been installed in preperation for the Campagnolo Recorf to be installed.

BB Adaptor

  • Primal Rides

    August 2008
    Mon Tue Wed Thu Fri Sat Sun
       
     123
    45678910
    11121314151617
    18192021222324
    25262728293031
  • Training Stats

    2482.70 Kilometers, 29 Kmh average speed

  • The Cloud of knowledge

  • Primal Cycling

Locations of visitors to this page